SH 99 (Grand Parkway), Segment G

TxDOT | Harris County, Texas

Baseline | DCCM, through a design-build project, was responsible for the surveying of 30 parcels for acquisition by TxDOT for Segment G of the Grand Parkway. This project was 4,200 linear feet long (0.8 miles). The project limits were from Northgate Crossing Boulevard (east of IH 45) on the west to the Hardy Toll Road on the east. All the work was performed in accordance with TxDOT standards and specifications. This work consisted of updating and completing right-of-way (ROW) maps, parcel plats, metes-and-bounds descriptions, and setting of Type II ROW monuments for Segment G.

Baseline | DCCM also created new ROW maps, parcel plats, metes-and-bounds descriptions, and set Type II ROW monuments for additional parcels required for both the construction of the southbound director connectors to the Hardy Toll Road and off-site easements. In addition, Baseline | DCCM also updated the supplied aerial planimetrics and prepared and updated control data sheets of new or replacement project control points.

Scroll to Top